MME/UPDA CIVIL EXAM PREPARATION

COURSE DETAILS:

This training course is for ministry of municipality and environment (MME) engineer’s registration in Qatar and training program is 30 Hrs., UPDA/MMUP Civil exam preparation training program includes the requirements of MME//UPDA Exam Requirements, UPDA Exam Procedure for Civil Engineers, MMUP/UPDA Exam Preparation Course / Syllabus 2020, UPDA Civil Exam Important Questions 2020, Etc.

Highlights of MMUP/UPDA Architecture Exam Preparation Training

  • Training will be provided by Industry Experienced & Certified Trainers
  • Complete PPT course presentation PDF documents (soft copy) to recall the basic engineering concepts will be given to training candidates
  • Chapter wise simulated exercises will be conducted during training
  • Wide-length simulation will be provided for MMUP questions as part of training
  • Free Re-training will be enabled in our public training programs for Non-pass candidates at CTC premises by inducting them in to ongoing training sessions
  • Guidance will be given for MMUP/UPDA application process and submission
  • Interactive Q&A sessions and sample exam simulations to help you pass the exam
  • Course material handouts with practice exam papers
  • We can extend the complete guidance in every stage till you get MMUP/UPDA License

WHO SHOULD ATTEND ?

  • Civil Engineers

ELIGIBILITY CRITERIA OF MMUP/UPDA

MME/UPDA License Exam Requirements:

  • Must be a Qatari citizen or resident in the State
  • Must have a bachelor’s degree in engineering or equivalent from university or institute
  • Be in possession of in their respective field
  • Must have good track record and reputation, must be never convicted of a felony or sentenced to prison for an offence involving moral turpitude or dishonesty, what he has been rehabilitated.

COURSE CONTENTS

Session: 1

  • Introduction to UPDA MMUP CIVIL Exam and Process
  • Pre Training Assessment Test – 15 Questions & Discussions

Session: 2

Civil Engineering Core Knowledge
MMUP CIVIL: Structural Analysis – 1

  • Loads, External & Internal Forces
  • Normal, Shear and Moments Diagrams and Signs
  • Statically Determinate Beams
  • Statically Indeterminate Beams and Hinged Beams

Session: 3

Civil Engineering Core Knowledge
MMUP CIVIL: Structural Analysis – 2

  • Plane Frames & Hinged Frames
  • Trusses
  • Deflection and Slope

Session: 4

Project Management Knowledge
Scope Management & Time Management

  • What Does Scope Mean?
  • WBS
  • Validate Scope & Control Scope
  • Work Package and Milestone
  • AOA {Activity on Arrow}
  • AON {Activity on Node} PDM {Precedence Diagram Method
  • Fast Tracking and Crashing

Session: 5

Project Management Knowledge
Cost Management

  • Determine Budget
  • Control Cost Example

Session: 6

Civil Engineering Core Knowledge
Materials

  • Steel Reinforcement
  • Sands
  • Concrete {Technology}
  • Woods
  • Others Materials

Session: 7

Civil Engineering Core Knowledge
Soil Mechanics

  • Soil Classification
  • Ground Improvement Techniques
  • Slope Stability
  • Retaining Walls
  • Embankments
  • Shallow Foundations and Pile Foundations


Traffic and Roads

  • Road Concept Design
  • Road Sections Details


Session: 8
Civil Engineering Core Knowledge
MMUP CIVIL-Fluids and Hydraulics

  • Fundamental of Fluids Flow
  • Flow through Pipes
  • Free Surface Flow


Session: 9
MMUP CIVIL – Surveying

  • Contours
  • Scales & Maps


Session: 10
Authorities Approvals, Bidding, Project Awarding and Project Starting Stage

Authorities Approvals

  • DC2 (Coverage, Requirements)
  • Civil Defense Requirement
  • Other Requirements


Bidding Process

  • Bid (Tender) – Invitation
  • Procurement Process
  • Closing Date

Awarding Projects

  • Selection Criteria
  • Technical
  • Commercials
  • Awarding Project {LOA}

Project Execution Phase

  • Kickoff Meeting
  • Commencement Date
  • Key Dates and Mobilizations

Contract and Claims Management
Contract Types

  • Fixed Price
  • Measurable
  • Cost Plus

Time Claims

  • Causes of Delays
  • Time Claims Examples

Cost Claims

  • Variations
  • Cost Impacts
  • Cost Claims
    Authority Inspections, Approvals and Services Connection
  • Civil Defense – Inspection Requirements and Clearance Certificate
  • Municipality Completion Certificate – Inspection requirements and completion certificate
  • Kahramaa Approvals and Connections – Connection requirements & Building Operation